Because my processor is a very thick 200L poly drum, I want to use a remote electric immersion heater inside a cylinder through which is pumped the WVO.
1. Would this be better positioned before the pump or after? ( I would opt for 'before the pump' as tI expect there will be less pressure to contend with.)
2. Anybody built one or bought one?
3. Are designs available?
G
1. Would this be better positioned before the pump or after? ( I would opt for 'before the pump' as tI expect there will be less pressure to contend with.)
2. Anybody built one or bought one?
3. Are designs available?
G
Comment